








|
The main goal of this document is to define, as precisely as
possible, the conditions of the four different trials. The users
requirements may express some wishes that are not possible to
satisfy, taking into account the reality of the existing (or
foreseen) network. Furthermore, the platform has to be developed
as generic as possible, and some requirements have to be
harmonized with their equivalent in the other trials.
So, D2 finalises the user requirements capture and analyses the
user desires. Comparison among the different trial sites is
performed to check for different approach and opinion among the
user communities and smaller groups within the cities. The fact
that the four sites are quite spread is very important for
compiling a comprehensive picture for the entire Europe.
D2 is based on D1 and on the infrastructure and technology
available and/or foreseen per site. In this deliverable the
consortium presents and documents the platform (network
infrastructure, equipment and service management frameworks) to
be used per trial and how the platform infrastructure can support
the user desires. Of special mention is also the documentation on
the ways to use the platform so as to introduce new services
after the normal duration of the project, with emphasis on the
high-layer entry points and handles to the functionality
substrates.
D2 documents also how each trial infrastructure will support user
requirements and what metrics are planned for quality of service
measurement and evaluation.
|